Part of a series of bulletins from the BAS excavations at Wickham House
Follow the project on our YouTube channel
In Trench 1A Jill, Ellena and Peter continued to explore the ditch along side the lane adjoining Ermin Street with a section revealing the stratigraphy of the lane. This was drawn in section and plan, samples taken for further post-excavation analysis and context sheets drafted. Ellena was very pleased with her discovery of a worked flint arrowhead within her first hour of being an archaeologist – a great start!

In Trench 1B Stuart, Dee and Geoff cleaned the surface they had been working to reveal of the past couple of days which highlighted at least one likely pit that will be explored further in 50% sections. Again, the planning and recording of these sections took much of the afternoon.

In Trenches 2A and 2B work continued to clean the surfaces excavated to date, and then to plan, photograph and record new contexts. In the afternoon work continued to excavate these new contexts.