{"id":12396,"date":"2025-04-02T12:28:19","date_gmt":"2025-04-02T11:28:19","guid":{"rendered":"https:\/\/www.berksarch.co.uk\/?p=12396"},"modified":"2025-07-29T16:10:38","modified_gmt":"2025-07-29T15:10:38","slug":"wickham-house-blog-day-1-1st-april-2025","status":"publish","type":"page","link":"https:\/\/www.berksarch.co.uk\/index.php\/wickham-house-blog-day-1-1st-april-2025\/","title":{"rendered":"Wickham House Blog: Day #1 (1st April 2025)"},"content":{"rendered":"\n<p><em>Part of a series of bulletins from the <a href=\"https:\/\/www.berksarch.co.uk\/index.php\/evaluation-excavations-at-wickham-house\/\" data-type=\"page\" data-id=\"12254\" target=\"_blank\" rel=\"noreferrer noopener\">BAS excavations at Wickham House<\/a><\/em><\/p>\n\n\n\n<p>Follow the project on our <a href=\"https:\/\/www.youtube.com\/playlist?list=PLqz4Lxf4xFrh1hsPGSqdKXkqBWJ04qlDq\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube channel<\/a><\/p>\n\n\n\n<p><strong>Attendees:<\/strong>&nbsp;Tim L, James and Keith<\/p>\n\n\n\n<p>Got straight to work with the GPS to layout the 20m x 20m site grid to an accuracy of 1cm as shown in Figure 1. This took 1 hour and each node was marked with a wooden post (aka broom handle) and labelled with the NGR easting\/northings to serve as a reference framework for the rest of the excavation as shown in the photograph in Figure 2. The GPS proved very straightforward to use and the increase accuracy of the grid (compared to using tape measures and trigonometry) was immediately visible to the eye.&nbsp;<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"451\" height=\"254\" src=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image.jpeg\" alt=\"\" class=\"wp-image-12398\" style=\"width:504px;height:auto\" srcset=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image.jpeg 451w, https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-300x169.jpeg 300w\" sizes=\"auto, (max-width: 451px) 100vw, 451px\" \/><figcaption class=\"wp-element-caption\"><em>Figure 1 &#8211; Locations of the 20m x 20m site grid shown by red dots\/letters<\/em><\/figcaption><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"344\" height=\"259\" src=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-1.jpeg\" alt=\"\" class=\"wp-image-12400\" style=\"width:504px;height:auto\" srcset=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-1.jpeg 344w, https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-1-300x226.jpeg 300w\" sizes=\"auto, (max-width: 344px) 100vw, 344px\" \/><figcaption class=\"wp-element-caption\"><em>Figure 2 &#8211; James and Tim surveying the site grid using GPS<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<p>The gradiometer survey then began in the N-S alignment with a total of eight squares (C\/H\/M\/R\/D\/I\/N\/S) being completed as shown in Figure 3. The result of this survey compare well with those taken in June 2023 as shown in Figures 4 and 5, but with combined with the site grid the georeferencing of the gradiometer image will allow trenches to be accurately located over features of interest.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"352\" height=\"265\" src=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-2.jpeg\" alt=\"\" class=\"wp-image-12402\" style=\"width:504px;height:auto\" srcset=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-2.jpeg 352w, https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-2-300x226.jpeg 300w\" sizes=\"auto, (max-width: 352px) 100vw, 352px\" \/><figcaption class=\"wp-element-caption\"><em>Figure 3 &#8211; Gradiometer surveying on Day #1<\/em><\/figcaption><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"453\" height=\"256\" src=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-3.jpeg\" alt=\"\" class=\"wp-image-12404\" style=\"width:504px;height:auto\" srcset=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-3.jpeg 453w, https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-3-300x170.jpeg 300w\" sizes=\"auto, (max-width: 453px) 100vw, 453px\" \/><figcaption class=\"wp-element-caption\"><em>Figure 5 \u2013 Day #1 gradiometer survey of the site<\/em><\/figcaption><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"451\" height=\"255\" src=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image.png\" alt=\"\" class=\"wp-image-12406\" style=\"width:504px;height:auto\" srcset=\"https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image.png 451w, https:\/\/www.berksarch.co.uk\/wp-content\/uploads\/2025\/04\/image-300x170.png 300w\" sizes=\"auto, (max-width: 451px) 100vw, 451px\" \/><figcaption class=\"wp-element-caption\"><em>Figure 6 \u2013 2023 gradiometer survey of the site<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<p>The rectilinear features within the new survey were then plotted onto the site grid and marked with temporary spray paint so that their scale could be assessed on the ground. From this it was possible to assess the relative size of these features&nbsp;&nbsp;and determine their likely function as part of building #2 as internal and\/or external spaces. On completion of the gradiometer survey and the high-resolution earth resistance survey a final decision will be made on the location of the initial trenches to be opened for excavation.<\/p>\n\n\n\n<figure class=\"wp-block-video\"><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Part of a series of bulletins from the BAS excavations at Wickham House Follow the project on our YouTube channel Attendees:&nbsp;Tim L, James and Keith Got straight to work with the GPS to layout the 20m x 20m site grid to an accuracy of 1cm as shown in Figure 1. This took 1 hour and &hellip; <a href=\"https:\/\/www.berksarch.co.uk\/index.php\/wickham-house-blog-day-1-1st-april-2025\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Wickham House Blog: Day #1 (1st April 2025)<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-12396","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.berksarch.co.uk\/index.php\/wp-json\/wp\/v2\/pages\/12396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.berksarch.co.uk\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.berksarch.co.uk\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.berksarch.co.uk\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.berksarch.co.uk\/index.php\/wp-json\/wp\/v2\/comments?post=12396"}],"version-history":[{"count":5,"href":"https:\/\/www.berksarch.co.uk\/index.php\/wp-json\/wp\/v2\/pages\/12396\/revisions"}],"predecessor-version":[{"id":12462,"href":"https:\/\/www.berksarch.co.uk\/index.php\/wp-json\/wp\/v2\/pages\/12396\/revisions\/12462"}],"wp:attachment":[{"href":"https:\/\/www.berksarch.co.uk\/index.php\/wp-json\/wp\/v2\/media?parent=12396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}